Head to head
Case Construction Equipment 221F vs Cormidi C85
The Case Construction Equipment 221F is the bigger machine by 5,125kg.
Last reviewed 13 September 2026
Key differences
- Operating weight: the Case Construction Equipment 221F is the bigger machine by 5,125kg.
Specifications side by side
| Case Construction Equipment 221F | Cormidi C85 | |
|---|---|---|
| Operating weight | 5,691kg | 566kg |
| Engine power | 55kW (74hp) | - |
| Load capacity | - | 800kg |
| Engine | - | Honda GX390 petrol 13hp or Yanmar LN100 diesel 10hp |
| Dimensions | - | 1,926mm long x 810mm wide x 1,336mm high |
| Skip capacity | - | 0.36m3, tips to 1.5m |
| Travel speed | - | 5.5km/h |
Sources: Case Construction Equipment 221F, Cormidi C85. Figures vary by model year and options, so check with the supplier before you commit.
Buy or hire the 221F if...
- you want one that is the bigger machine by 5,125kg
A compact wheeled loading shovel used for yard work, muck-away and material handling on smaller sites. Its size suits jobs too tight for a full-size wheel loader but too heavy for a skid steer.
Listed by
- Baz plant Sales agricultural plant and machinery dealer - Chesterfield
Buy or hire the C85 if...
A compact tracked dumper narrow enough for a garden gate, used by landscapers and groundworkers to move soil, aggregate or waste on sites a full-size dumper cannot access. The high-tip skip lets it load straight into a waiting skip or trailer.
Listed by
- West Sussex Plant Hire - Hassocks, Keymer
Common questions
What is the difference between the Case Construction Equipment 221F and the Cormidi C85?
The Case Construction Equipment 221F is the bigger machine by 5,125kg. The Case Construction Equipment 221F is a compact wheel loader; the Cormidi C85 is a tracked mini dumper.
GetBrent is an independent directory and is not a dealer for, nor affiliated with, either manufacturer. Model and brand names are the trademarks of their owners.
